CSCA 5414 — Finish remaining videos/readings
Complete remaining Module 4 videos and readings: NP examples, CLRS 34.5, computation/physics, qubits, Bell’s Inequality, and Grover’s Algorithm.
|
2026-06-18 |
Not Started |
School |
High |
|
|
Caleb |
2 |
Edit
Delete
|
|
CSCA 5424 — Complete Diet and Network Flow lab
Complete Interactive Notes: Diet Problem and Network Flow Problems.
|
2026-06-18 |
Not Started |
School |
High |
|
|
Caleb |
2 |
Edit
Delete
|
|
CSCA 5424 — Complete Network Flow Problems as LPs quiz
Complete overdue graded assignment: Network Flow Problems as LPs.
|
2026-06-18 |
Not Started |
School |
Very High |
|
|
Caleb |
2 |
Edit
Delete
|
|
CSCA 5424 — Watch Network Flow Problems and Linear Programs video
Complete Network Flow Problems and Linear Programs video.
|
2026-06-18 |
Not Started |
School |
High |
|
|
Caleb |
2 |
Edit
Delete
|
|
Lab duration about 1 hour.
CSCA 5424 — Complete Network Flow Problems as LPs quiz Complete overdue graded assignment: Network Flow Problems as LPs.
|
2026-06-18 |
Not Started |
School |
Very High |
|
|
Caleb |
-10 |
Edit
Delete
|
|
Remaining: about 2h 11m video and 20m reading.
CSCA 5414 — Final exam 3-hour session Set up and complete a protected 3-hour final exam work session for CSCA 5414 Dynamic Programming, Greedy Algorithms.
|
2026-06-18 |
Not Started |
School |
Very High |
|
|
Caleb |
-10 |
Edit
Delete
|
|
CSCA 5424 — Complete Geometry of Linear Programs quiz
Complete overdue graded assignment: Geometry of Linear Programs.
|
2026-06-19 |
Not Started |
School |
Very High |
|
|
Caleb |
3 |
Edit
Delete
|
|
CSCA 5424 — Watch Geometry of Linear Programs video
Complete Geometry of Linear Programs video.
|
2026-06-19 |
Not Started |
School |
High |
|
|
Caleb |
3 |
Edit
Delete
|
|
CSCA 5454 — Resume GCD and Euclid lab
Resume Notes on GCD, Euclid's Algorithm and Extended GCD lab.
|
2026-06-19 |
Not Started |
School |
High |
|
|
Caleb |
3 |
Edit
Delete
|
|
CSCA 5454 — Watch Euclid's Algorithm and GCD video
Complete Euclid's Algorithm and GCD video.
|
2026-06-19 |
Not Started |
School |
High |
|
|
Caleb |
3 |
Edit
Delete
|
|
Complete CSCA 5414 before vacation
Finish the remaining CSCA 5414 Dynamic Programming, Greedy Algorithms work before leaving for vacation if feasible.
|
2026-06-19 |
Not Started |
School |
Very High |
|
|
Caleb |
3 |
Edit
Delete
|
|
Do not perfect forever. Goal is a usable v1.
CSCA 5454 — Resume GCD and Euclid lab Resume Notes on GCD, Euclid's Algorithm and Extended GCD lab.
|
2026-06-19 |
Not Started |
School |
High |
|
|
Caleb |
-9 |
Edit
Delete
|
|
Lab duration about 1 hour. Page says click to resume.
CSCA 5454 — Watch Euclid's Algorithm and GCD video Complete Euclid's Algorithm and GCD video.
|
2026-06-19 |
Not Started |
School |
High |
|
|
Caleb |
-9 |
Edit
Delete
|
|
System improvement; current reminders can still show already-completed tasks.
Finish logo for The Human Algorithm Finalize usable business logo for The Human Algorithm; create at least one clean version suitable for website, profile image, and invoice/payment pages.
|
2026-06-19 |
Not Started |
Work |
High |
|
|
Caleb |
-9 |
Edit
Delete
|
|
Video duration 19 minutes.
CSCA 5424 — Complete Geometry of Linear Programs quiz Complete overdue graded assignment: Geometry of Linear Programs.
|
2026-06-19 |
Not Started |
School |
Very High |
|
|
Caleb |
-9 |
Edit
Delete
|
|
Video duration 23 minutes.
CSCA 5424 — Watch Geometry of Linear Programs video Complete Geometry of Linear Programs video.
|
2026-06-19 |
Not Started |
School |
High |
|
|
Caleb |
-9 |
Edit
Delete
|
|
1 lecture : CSCA 5454 Advanced Data Structures, RSA and Quantum Algorithms
|
2026-06-20 |
Not Started |
School |
High |
|
|
Caleb |
-8 |
Edit
Delete
|
|
CSCA 5424 — Complete Geometry and Simplex lab
Complete Interactive Notes on Geometry of Linear Programs and Simplex Algorithm.
|
2026-06-20 |
Not Started |
School |
High |
|
|
Caleb |
4 |
Edit
Delete
|
|
CSCA 5424 — Complete LP Algorithms quiz
Complete overdue graded assignment: LP Algorithms.
|
2026-06-20 |
Not Started |
School |
Very High |
|
|
Caleb |
4 |
Edit
Delete
|
|
CSCA 5424 — Watch Algorithms for Solving Linear Programs video
Complete Algorithms for Solving Linear Programs video.
|
2026-06-20 |
Not Started |
School |
High |
|
|
Caleb |
4 |
Edit
Delete
|
|
CSCA 5454 — Complete GCD and Euclid's Algorithm quiz
Complete overdue graded assignment for GCD and Euclid's Algorithm.
|
2026-06-20 |
Not Started |
School |
Very High |
|
|
Caleb |
4 |
Edit
Delete
|
|
CSCA 5454 — Watch Extended Euclid Bezout Coefficients video
Complete Extended Euclid Bezout Coefficients video.
|
2026-06-20 |
Not Started |
School |
High |
|
|
Caleb |
4 |
Edit
Delete
|
|
Overdue graded assignment. Estimated 30 minutes. Locked until deadline reset/schedule switch.
CSCA 5454 — Watch Extended Euclid Bezout Coefficients video Complete Extended Euclid Bezout Coefficients video.
|
2026-06-20 |
Not Started |
School |
High |
|
|
Caleb |
-8 |
Edit
Delete
|
|
Reset due date. One focused lecture block, not whole-course catchup.
1 lecture : CSCA 5454 Advanced Data Structures, RSA and Quantum Algorithms
|
2026-06-20 |
Not Started |
School |
High |
|
|
Caleb |
-8 |
Edit
Delete
|
|
Video duration 18 minutes.
CSCA 5424 — Watch Algorithms for Solving Linear Programs video Complete Algorithms for Solving Linear Programs video.
|
2026-06-20 |
Not Started |
School |
High |
|
|
Caleb |
-8 |
Edit
Delete
|
|
CSCA 5424 — Start Linear Programming assignment
Open Linear Programming programming assignment, read requirements, set up files/environment, and complete first solvable part.
|
2026-06-21 |
Not Started |
School |
Very High |
|
|
Caleb |
5 |
Edit
Delete
|
|
CSCA 5454 — Complete Bezout Coefficients quiz
Complete overdue graded assignment for Bezout Coefficients.
|
2026-06-21 |
Not Started |
School |
Very High |
|
|
Caleb |
5 |
Edit
Delete
|
|
Exercise is the current energy foundation.
Pack Starlink and school/task gear for vacation Pack Starlink, charger, laptop, school materials, and anything needed for spreadsheet tasks while away.
|
2026-06-21 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-7 |
Edit
Delete
|
|
Overdue graded assignment. Estimated 20 minutes. Locked until deadline reset/schedule switch.
CSCA 5424 — Start Linear Programming assignment Open Linear Programming programming assignment, read requirements, set up files/environment, and complete first solvable part.
|
2026-06-21 |
Not Started |
School |
Very High |
|
|
Caleb |
-7 |
Edit
Delete
|
|
Overdue programming assignment. Estimated 3 hours total. Split into start and finish.
Pack exercise gear for vacation Pack running shoes and clothes that can be sweated in so exercise stays possible during vacation.
|
2026-06-21 |
Not Started |
Personal |
High |
|
|
Caleb |
-7 |
Edit
Delete
|
|
Pair with hardware/storage errand if possible.
Book dog vaccination appointment Book vaccination appointment for Oliver and Eulah once price and required shots are clear.
|
2026-06-21 |
Not Started |
Personal |
High |
|
|
Caleb |
-7 |
Edit
Delete
|
|
Reset due date. Do after CSCA 5424 lecture if school energy allows.
Get items from storage find tie-wraps for install of fence extension,get calipers from storage to measure post that the board would clamp to
|
2026-06-21 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-7 |
Edit
Delete
|
|
CSCA 5424 — Complete Linear Programming assignment
Finish and submit Linear Programming programming assignment.
|
2026-06-22 |
Not Started |
School |
Very High |
|
|
Caleb |
6 |
Edit
Delete
|
|
CSCA 5454 — Complete RSA public key cryptosystem lab
Complete Notes on RSA public key cryptosystem lab.
|
2026-06-22 |
Not Started |
School |
High |
|
|
Caleb |
6 |
Edit
Delete
|
|
CSCA 5454 — Watch RSA Cryptography video
Complete RSA Cryptography video.
|
2026-06-22 |
Not Started |
School |
High |
|
|
Caleb |
6 |
Edit
Delete
|
|
Discuss Eulah training plan with Sonya
Review trainer recommendation, schedule, and cost with Sonya before booking the program or charging the credit card.
|
2026-06-22 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-6 |
Edit
Delete
|
|
Do after Humane Society replies or after choosing another transparent option.
Discuss Eulah training plan with Sonya Review trainer recommendation, schedule, and cost with Sonya before booking the program or charging the credit card.
|
2026-06-22 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-6 |
Edit
Delete
|
|
Do after logo v1 or use temporary branding if needed.
CSCA 5454 — Watch RSA Cryptography video Complete RSA Cryptography video.
|
2026-06-22 |
Not Started |
School |
High |
|
|
Caleb |
-6 |
Edit
Delete
|
|
Only pack what supports realistic vacation work, not the whole office.
Set up Buy Me a Coffee account Create Buy Me a Coffee account/page for The Human Algorithm or Caleb Ford; add basic profile, payment setup, and short support description.
|
2026-06-22 |
Not Started |
Work |
Medium |
|
|
Caleb |
-6 |
Edit
Delete
|
|
Set up Buy Me a Coffee account
Create Buy Me a Coffee account/page for The Human Algorithm or Caleb Ford; add basic profile, payment setup, and short support description.
|
2026-06-22 |
Not Started |
Work |
Medium |
|
|
Caleb |
6 |
Edit
Delete
|
|
Video duration 43 minutes.
CSCA 5454 — Complete RSA public key cryptosystem lab Complete Notes on RSA public key cryptosystem lab.
|
2026-06-22 |
Not Started |
School |
High |
|
|
Caleb |
-6 |
Edit
Delete
|
|
Buy 3 116 inch garden trim that is at least 2 inches tall, must have holes.
|
2026-06-23 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-5 |
Edit
Delete
|
|
CSCA 5424 — Final exam 3-hour session
Set up and complete a protected 3-hour final exam work session for CSCA 5424 Approximation Algorithms and Linear Programming.
|
2026-06-23 |
Not Started |
School |
Very High |
|
|
Caleb |
7 |
Edit
Delete
|
|
CSCA 5454 — Complete Quiz on RSA
Complete overdue graded Quiz on RSA.
|
2026-06-23 |
Not Started |
School |
Very High |
|
|
Caleb |
7 |
Edit
Delete
|
|
CSCA 5454 — Watch Quantum Physics Computing Basics video
Complete Quantum Physics Computing Basics video.
|
2026-06-23 |
Not Started |
School |
High |
|
|
Caleb |
7 |
Edit
Delete
|
|
Overdue graded assignment. Estimated 50 minutes. Locked until deadline reset/schedule switch.
CSCA 5454 — Watch Quantum Physics Computing Basics video Complete Quantum Physics Computing Basics video.
|
2026-06-23 |
Not Started |
School |
High |
|
|
Caleb |
-5 |
Edit
Delete
|
|
Overdue programming assignment. Estimated 3 hours total. Current schedule ends Jun 22, 2026 at 12:59 AM MDT.
CSCA 5454 — Complete Quiz on RSA Complete overdue graded Quiz on RSA.
|
2026-06-23 |
Not Started |
School |
Very High |
|
|
Caleb |
-5 |
Edit
Delete
|
|
Sonya said charge to credit card, but discuss before booking the program.
Buy 3 116 inch garden trim that is at least 2 inches tall, must have holes.
|
2026-06-23 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-5 |
Edit
Delete
|
|
Video duration 41 minutes.
CSCA 5424 — Final exam 3-hour session Set up and complete a protected 3-hour final exam work session for CSCA 5424 Approximation Algorithms and Linear Programming.
|
2026-06-23 |
Not Started |
School |
Very High |
|
|
Caleb |
-5 |
Edit
Delete
|
|
CSCA 5454 — Start Week 1 Programming Assignment
Open Week 1 Programming Assignment, read requirements, set up files/environment, and complete first solvable part.
|
2026-06-24 |
Not Started |
School |
Very High |
|
|
Caleb |
8 |
Edit
Delete
|
|
Do after measuring post and getting bracket.
Update dog vaccination records After appointment is booked or completed, save/update vaccination records for Oliver and Eulah.
|
2026-06-24 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-4 |
Edit
Delete
|
|
replace board at back right of chain link so that it fits snugly
|
2026-06-24 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-4 |
Edit
Delete
|
|
CSCA 5454 — Complete Week 1 Programming Assignment
Finish and submit Week 1 Programming Assignment for CSCA 5454.
|
2026-06-25 |
Not Started |
School |
Very High |
|
|
Caleb |
9 |
Edit
Delete
|
|
Install lumber that you have for dog barrier
|
2026-06-25 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-3 |
Edit
Delete
|
|
Keep records accessible for boarding, training, travel, or vet needs.
Install lumber that you have for dog barrier
|
2026-06-25 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-3 |
Edit
Delete
|
|
Research new AT tires for Tacoma
Research all-terrain tire options for 2020 Tacoma SR5 DCLB 4x4; compare size, load rating, winter/snow performance, road noise, tread life, and price installed.
|
2026-06-25 |
Not Started |
Personal |
Medium |
|
|
Caleb |
9 |
Edit
Delete
|
|
CSCA 5454 — Finish remaining Module 4 videos
Complete all remaining Module 4 videos for CSCA 5454.
|
2026-06-26 |
Not Started |
School |
High |
|
|
Caleb |
10 |
Edit
Delete
|
|
Clean up back porch can/trash area
Sort the trashy back porch area; figure out what to do with the cans/containers that cannot go with normal trash.
|
2026-06-26 |
Not Started |
Personal |
Medium |
|
|
Caleb |
10 |
Edit
Delete
|
|
Do after buying garden trim.
Schedule training session for Eulah Review Strong Bond Dog Training, Think Smart Dog, and Front Range Dog Training; compare approach, private training options, puppy social option, and fit for Eulah.
|
2026-06-26 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-2 |
Edit
Delete
|
|
Remaining video total shown: about 2h 7m. All readings completed.
Clean up back porch can/trash area Sort the trashy back porch area; figure out what to do with the cans/containers that cannot go with normal trash.
|
2026-06-26 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-2 |
Edit
Delete
|
|
Schedule training session for Eulah
Review Strong Bond Dog Training, Think Smart Dog, and Front Range Dog Training; compare approach, private training options, puppy social option, and fit for Eulah.
|
2026-06-26 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-2 |
Edit
Delete
|
|
Sonya sent links May 9. Goal is to choose 1–2 best options for initial contact.
clear a path to the elliptical in the storage unit
|
2026-06-26 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-2 |
Edit
Delete
|
|
Truck becomes reward, not avoidance. Start immediately.
CSCA 5454 — Finish remaining Module 4 videos Complete all remaining Module 4 videos for CSCA 5454.
|
2026-06-26 |
Not Started |
School |
High |
|
|
Caleb |
-2 |
Edit
Delete
|
|
clear a path to the elliptical in the storage unit
|
2026-06-26 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-2 |
Edit
Delete
|
|
Build secure wood barrier for alleyway gate
Construct a more permanent wood piece that slides over the top and rests securely on the ground.
|
2026-06-27 |
Not Started |
Personal |
Medium |
|
|
Caleb |
-1 |
Edit
Delete
|
|
Get tire quotes for Tacoma
Contact or check 2–3 tire shops for installed out-the-door quotes on preferred AT tire options.
|
2026-06-27 |
Not Started |
Personal |
Medium |
|
|
Caleb |
11 |
Edit
Delete
|
|
Schedule bordetella shots
|
2026-06-27 |
Not Started |
Personal |
High |
|
|
Caleb |
-1 |
Edit
Delete
|
|
Separate from transporting elliptical.
Schedule bordetella shots
|
2026-06-27 |
Not Started |
Personal |
High |
|
|
Caleb |
-1 |
Edit
Delete
|
|
Research chairs that I can sit in cross legged at my work station
|
2026-06-28 |
Not Started |
|
Low |
|
|
|
|
Edit
Delete
|
|
Replace temporary bar setup. Do after lumber/source measurements.
Schedule initial meeting Reach out to the preferred dog training option(s) to ask about initial meeting, recommended training schedule, and cost estimate.
|
2026-06-29 |
Not Started |
Personal |
High |
|
|
Caleb |
1 |
Edit
Delete
|
|
take elliptical to the rental
|
2026-06-29 |
Not Started |
Personal |
Medium |
|
|
Caleb |
1 |
Edit
Delete
|
|
Do after clearing path.
Visit GoVoteColorado.gov for more election information.
|
2026-06-30 |
Not Started |
Personal |
Low |
|
|
Caleb |
2 |
Edit
Delete
|
|
Include Discount Tire/Costco/local shop if convenient. Ask about installation, disposal, warranty, and alignment recommendation.
Set up Patreon if still useful Create Patreon only if it clearly supports the business model after evaluation.
|
2026-06-30 |
Not Started |
Work |
Low |
|
|
Caleb |
2 |
Edit
Delete
|
|
Optional. Do not let this block higher-value client/business work.
Update grocery delivery recurrence Set grocery delivery recurring schedule to every 4 weeks on the first Wednesday, starting July 1.
|
2026-06-30 |
Not Started |
Personal |
Medium |
|
|
Caleb |
2 |
Edit
Delete
|
|
Set up Patreon if still useful
Create Patreon only if it clearly supports the business model after evaluation.
|
2026-06-30 |
Not Started |
Work |
Low |
|
|
Caleb |
14 |
Edit
Delete
|
|
Update CU email recurrence
Set CU email check to every 2 weeks because of job board emails.
|
2026-06-30 |
Not Started |
School |
Medium |
|
|
Caleb |
14 |
Edit
Delete
|
|
Update CU email recurrence Set CU email check to every 2 weeks because of job board emails.
|
2026-06-30 |
Not Started |
School |
Medium |
|
|
Caleb |
-4 |
Edit
Delete
|
|
Visit GoVoteColorado.gov for more election information.
|
2026-06-30 |
Not Started |
Personal |
Low |
|
|
Caleb |
2 |
Edit
Delete
|
|
loop in ashton to the app to explore ifs work half the time
|
2026-06-30 |
Not Started |
|
Low |
|
|
|
|
Edit
Delete
|
|
pay new orleans parking ticket
|
2026-06-30 |
Not Started |
|
Low |
|
|
|
|
Edit
Delete
|
|
research longmont tinkermill
|
2026-06-30 |
Not Started |
|
Low |
|
|
|
|
Edit
Delete
|
|
Check/order contacts every 6 months
Set recurring check to order contacts every 6 months.
|
2026-07-01 |
Not Started |
Personal |
Low |
|
|
Caleb |
15 |
Edit
Delete
|
|
Recurring, not daily.
Check/order contacts every 6 months Set recurring check to order contacts every 6 months.
|
2026-07-01 |
Not Started |
Personal |
Low |
|
|
Caleb |
3 |
Edit
Delete
|
|
transport elliptical to Nederland Transfer station
|
2026-07-02 |
Not Started |
Personal |
Medium |
|
|
Caleb |
4 |
Edit
Delete
|
|
Buy and install new AT tires for Tacoma
Purchase and install selected all-terrain tires for Tacoma.
|
2026-07-05 |
Not Started |
Personal |
Medium |
|
|
Caleb |
19 |
Edit
Delete
|
|
Buy and install new AT tires for Tacoma
|
2026-07-05 |
Not Started |
Personal |
Medium |
|
Leave house |
Caleb |
-2 |
Edit
Delete
|
|
Investigate adding Zepp/Watch integration
|
2026-07-10 |
Not Started |
Development / Software |
High |
|
|
Caleb |
3 |
Edit
Delete
|
|
You said reading was already done and the prompt should be quick.
Connect task notification Done/Skip/Snooze buttons Connect spreadsheet Done/Skip/Snooze architecture to the third-party notification app so watch reminders reflect actual status.
|
2026-07-10 |
Not Started |
Work |
Medium |
|
|
Caleb |
12 |
Edit
Delete
|
|
Sen
Send $20 to Luis
|
2026-07-15 |
Not Started |
Personal |
Medium |
|
|
|
1 |
Edit
Delete
|
|
Restore password reset functionality to 'The Robot'
|
2026-07-16 |
Not Started |
|
High |
|
|
Caleb |
2 |
Edit
Delete
|
|
Communicate with Mace about Treatment spending
|
2026-07-30 |
Not Started |
AA |
High |
|
|
Caleb |
3 |
Edit
Delete
|
|
Respond to Heather Cronk email
|
2026-07-31 |
Not Started |
Career |
Very High |
|
|
|
|
Edit
Delete
|
|
Measure the truck-bed setup and determine how much space the two mattresses will occupy.
|
2026-08-01 |
Not Started |
|
Low |
|
|
|
|
Edit
Delete
|
|
Make progress on truck bed
Measure and cut the back and side plywood panels for the truck-bed camper; make a cut list first.
|
2026-08-03 |
Not Started |
Personal |
Low |
|
|
Caleb |
2 |
Edit
Delete
|
|
Mattresses for truck bed
Buy two four-inch roll-up memory-foam mattresses/pads.
|
2026-08-05 |
Not Started |
Personal |
Low |
|
|
Caleb |
4 |
Edit
Delete
|
|
Research finasteride, dutasteride, and minoxidil.
|
2026-08-07 |
Not Started |
Health |
Medium |
|
|
|
6 |
Edit
Delete
|
|
Dermatologist
Book a routine dermatologist appointment and ask about trialing finasteride and minoxidil.
|
2026-08-08 |
Not Started |
Health |
High |
|
|
Caleb |
7 |
Edit
Delete
|
|
Take large trash items to the landfill day
Saturday, August 8, from 7 a.m. – 2 p.m.
IMPORTANT: Please be sure to bring a current City of Longmont Utility Bill and identification to show that you are a City resident.
|
2026-08-08 |
Not Started |
Moving |
Very High |
7:00 AM - 2:00 PM |
Leave house |
Caleb |
9 |
Edit
Delete
|
|
Finish logo for The Human Algorithm
Finalize usable business logo for The Human Algorithm; create at least one clean version suitable for website, profile image, and invoice/payment pages.
|
2026-08-14 |
Not Started |
|
High |
|
|
Caleb |
3 |
Edit
Delete
|
|
Add monthly service work task
Add recurring monthly service work task; use AI prompt after source reading is done.
|
2026-08-25 |
Not Started |
|
Medium |
|
|
Caleb |
14 |
Edit
Delete
|
|
Read CU email
|
2026-03-12 |
Complete |
School |
Low |
|
|
Caleb |
|
Edit
Delete
|
|
Wash sinks
|
2026-03-12 |
Complete |
Housework |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Cycle dishes in dishwasher
|
2026-03-13 |
Complete |
Housework |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Proactive cleaning / Basement floor
|
2026-03-15 |
Complete |
Housework |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Interview prep (Trimble)
|
2026-03-17 |
Complete |
Work |
Very High |
|
|
Caleb |
|
Edit
Delete
|
|
Resolve therapy conflict
|
2026-03-17 |
Complete |
Personal |
Very High |
|
|
Caleb |
|
Edit
Delete
|
|
Send LinkedIn credentials to Sonia
Provide login + context for profile update
|
2026-03-17 |
Complete |
Career |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Take Trash and Recycling to the Transfer Station
|
2026-03-20 |
Complete |
Housework |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Review written agreements with Sonya
|
2026-03-23 |
Complete |
Housework |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Call / Plan with Nicholas
|
2026-03-24 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Look into Truck registration and discuss with Sonya
|
2026-03-24 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Make progress on task input to this system
|
2026-03-24 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Call Free Range Moving
|
2026-04-01 |
Complete |
Work |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Parakeet Job Interview task
|
2026-04-01 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Box belongings for the move
|
2026-04-08 |
Complete |
Moving |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Pick up moving boxes
|
2026-04-08 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Restructure Calendar to accomodate schoolwork
|
2026-04-08 |
Complete |
School |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Buy storage unit in Longmont
|
2026-04-11 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
identify rooms in each timeframe, subdivide tasks in those, set due dates
|
2026-04-14 |
Complete |
Moving |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Return Eldora uniform
|
2026-04-19 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Finish phase 2 of move deadlines
|
2026-04-20 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Basement Living Room + Fireplace + Freezer
Deep clean, pack, and clear area
|
2026-04-22 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Return wood splitter
Transport items and finalize logistics
|
2026-04-22 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
beyond the coverage EMAIL SYSTEM
|
2026-04-22 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
reopen bluevine account for THA
|
2026-04-22 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Caleb’s Room
Pack, clean, and declutter
|
2026-04-23 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Upstairs Closet
Clear and organize closet
|
2026-04-23 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
brush eulah
|
2026-04-23 |
Complete |
Pets |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Call with Sammie
|
2026-04-24 |
Complete |
Work |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Foyer + Foyer Closet
Clear entryway and organize storage
|
2026-04-24 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Upstairs Bathroom
Clean, pack essentials, clear space
|
2026-04-24 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Storage Room
Clear, organize, pack storage items
|
2026-04-28 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Master Closet + Bathroom
Clear, organize, and pack
|
2026-04-29 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Dining + Living Room
Pack, clean, declutter shared space
|
2026-04-30 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Ask Sonya about Ashton collaborating with Anna
|
2026-05-04 |
Complete |
Personal |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Move large metal shelving from utility room
|
2026-05-05 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Kitchen
Pack non-essentials, organize, clean
|
2026-05-07 |
Complete |
Moving |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Move to Storage + Logistics Lock
Transport items and finalize logistics
|
2026-05-09 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Day 2 Run
|
2026-05-12 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Help package and store the tv
|
2026-05-13 |
Complete |
Moving |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Outdoors (Full Pass)
Clean, organize, and prep all outdoor areas
|
2026-05-13 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Pare down email subscriptions
|
2026-05-14 |
Complete |
Personal |
Low |
|
|
Caleb |
|
Edit
Delete
|
|
Take all trash and oil waste to transfer station
|
2026-05-15 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
DAY 1 RUN
|
2026-05-17 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
work on selling items
|
2026-05-17 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Compile a box of donations and a pile of trashed items
|
2026-05-19 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
DAY 1 RUN
|
2026-05-20 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Discuss logistics for move to Toronto with Sonya
|
2026-05-22 |
Complete |
Moving |
Very High |
|
|
Caleb |
|
Edit
Delete
|
|
Get circular saw and tape measure out of storage
Retrieve tools needed to measure and build backyard dog escape barriers for Hula.
|
2026-05-22 |
Complete |
Personal |
High |
|
|
Caleb |
2 |
Edit
Delete
|
|
Send Kevin Service manual, assign reading
|
2026-05-22 |
Complete |
Personal |
Low |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — audit current workflows
Review ci.yml and ci-cd.yml; confirm what runs on main, develop, PRs, and pushes.
|
2026-05-26 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Move tires to the rental
|
2026-05-26 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — define branch and environment flow
Map develop → dev, main → staging, tag/manual approval → production.
|
2026-05-27 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — create dev workflow
Create workflow for PRs to develop and pushes to develop; include lint, build, deploy to dev.
|
2026-05-28 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — create production workflow
Create manual/tag-triggered production workflow with build, approval, deploy, and health check steps.
|
2026-05-28 |
Complete |
Work |
Very High |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — add dev smoke tests
Add basic smoke tests against DEV_APP_URL after dev deployment.
|
2026-05-29 |
Complete |
Work |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — add production health checks
Add post-deploy checks for homepage, contact API, and expected production URL.
|
2026-05-29 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Post Sonya's elliptical on FB marketplace
|
2026-05-29 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Take items to Arc center
|
2026-05-29 |
Complete |
Moving |
Low |
|
|
Caleb |
-34 |
Edit
Delete
|
|
figure out what the best crossing point is for visa processing.
|
2026-05-29 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — create staging workflow
Create workflow for pushes to main; include full tests, build, coverage, deploy to staging.
|
2026-05-30 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — add staging integration tests
Add integration tests after staging deploy; test contact form/API path safely.
|
2026-05-31 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — document rollback and usage
Write short README notes for how to deploy dev/staging/prod, approve production, and rollback if needed.
|
2026-05-31 |
Complete |
Work |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Inspect back right corner for hidden openings
Check tree and shrub-covered corner for gaps, holes, weak fence points, or crawl-through spots.
|
2026-05-31 |
Complete |
Personal |
High |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — configure GitHub secrets
Add VERCEL_TOKEN, VERCEL_ORG_ID, VERCEL_PROJECT_ID, SUPABASE_URL, SUPABASE_SERVICE_KEY, RESEND_API_KEY, and app URLs.
|
2026-06-01 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — configure GitHub environments
Create dev, staging, and production environments; add production approval requirement.
|
2026-06-02 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
10 minute Quizlet Study Module 1 : CSCA 5424 Approximation Algorithms and Linear Programming
|
2026-06-03 |
Complete |
School |
High |
|
|
Caleb |
|
Edit
Delete
|
|
10 minute Quizlet Study Module 1 : CSCA 5454 Advanced Data Structures, RSA and Quantum Algorithms
|
2026-06-03 |
Complete |
School |
High |
|
|
Caleb |
|
Edit
Delete
|
|
10 minute Quizlet Study Module 1 : CSCA 5414 Dynamic Programming, Greedy Algorithms
|
2026-06-03 |
Complete |
School |
High |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — configure Vercel environment variables
Set dev, staging, and production env vars in Vercel; confirm NEXT_PUBLIC_APP_URL values.
|
2026-06-03 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Ask for time off for Toronto trip
|
2026-06-04 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
BTC CI/CD — test full pipeline end to end
Run develop → dev, main → staging, and manual/tag → production path with a harmless change.
|
2026-06-05 |
Complete |
Work |
Very High |
|
|
Caleb |
|
Edit
Delete
|
|
1 lecture : CSCA 5414 Dynamic Programming, Greedy Algorithms
|
2026-06-07 |
Complete |
School |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Add Beyond the Coverage handoff comments to spreadsheet
Transfer handoff tasks currently written as document comments into the task spreadsheet so they can be tracked individually.
|
2026-06-16 |
Complete |
Work |
High |
|
|
Caleb |
|
Edit
Delete
|
|
CSCA 5414 — Complete NP Completeness Problems graded assignment
Finish overdue graded assignment for CSCA 5414 Dynamic Programming, Greedy Algorithms.
|
2026-06-16 |
Complete |
School |
Very High |
|
|
Caleb |
|
Edit
Delete
|
|
CSCA 5414 — Start Problem Set 4
Open CSCA 5414 Problem Set 4, read requirements, set up files/environment, and complete first solvable part.
|
2026-06-16 |
Complete |
School |
Very High |
|
|
Caleb |
|
Edit
Delete
|
|
CSCA 5454 — Switch into next course schedule
Switch CSCA 5454 Advanced Data Structures, RSA and Quantum Algorithms into the next available schedule so locked assignments reopen and progress carries over.
|
2026-06-16 |
Complete |
School |
Very High |
|
|
Caleb |
|
Edit
Delete
|
|
Fix Heroku account
Regain access; fix billing/account issue; identify blocker if stuck; write down the next step.
|
2026-06-16 |
Complete |
Work |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
CSCA 5424 — Complete Solving LPs using PULP quiz
https://www.coursera.org/learn/linear-programming-and-approximation-algorithms/assignment-submission/NVhYH/solving-lps-using-pulp
|
2026-06-17 |
Complete |
School |
Very High |
|
|
Caleb |
-29 |
Edit
Delete
|
|
Due June 17, 2026 at 11:59 PM MDT.
CSCA 5424 — Complete PULP formulation lab Complete Lab: Formulate and Solve LPs using PULP.
|
2026-06-17 |
Complete |
School |
High |
|
|
Caleb |
-11 |
Edit
Delete
|
|
Follow up with Humane Society about dog vaccinations
If Humane Society has not replied, follow up about vaccination availability, pricing, appointment process, and which shots Oliver and Eulah need.
|
2026-06-18 |
Complete |
Personal |
High |
|
|
Caleb |
|
Edit
Delete
|
|
Contact preferred dog trainer for initial meeting
Reach out to the preferred dog training option(s) to ask about initial meeting, recommended training schedule, and cost estimate.
|
2026-06-21 |
Complete |
Personal |
High |
|
|
Caleb |
|
Edit
Delete
|
|
measure post, go get bracket from Ace Hardware
Measure post with calipers, then get appropriate bracket from Ace Hardware.
|
2026-06-21 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
File the periodic report for the human algorithm
|
2026-06-28 |
Complete |
|
Low |
|
|
|
|
Edit
Delete
|
|
Set up alerts so you don't miss your shift at the Longmont Feud Rescue
|
2026-06-28 |
Complete |
|
Low |
|
|
|
-18 |
Edit
Delete
|
|
Set up like alerts for your dental appointment
|
2026-06-28 |
Complete |
|
Low |
|
|
|
|
Edit
Delete
|
|
Cook black means
|
2026-06-29 |
Complete |
|
Low |
3:34 PM - |
|
|
1 |
Edit
Delete
|
|
Schedule initial meeting
Reach out to the preferred dog training option(s) to ask about initial meeting, recommended training schedule, and cost estimate.
|
2026-06-29 |
Complete |
Personal |
High |
|
|
Caleb |
1 |
Edit
Delete
|
|
Cast a ballot in the Statewide Primary
9595 Nelson Rd, Longmont, CO 80501
|
2026-06-30 |
Complete |
Personal |
Very High |
- 7:00 PM |
|
Caleb |
1 |
Edit
Delete
|
|
Put away clean dishes
|
2026-06-30 |
Complete |
Housework |
Low |
|
|
Caleb |
|
Edit
Delete
|
|
Put exercise tasks into list
|
2026-06-30 |
Complete |
|
Low |
|
|
|
|
Edit
Delete
|
|
add habits visual to insights page
|
2026-06-30 |
Complete |
|
Low |
|
|
|
|
Edit
Delete
|
|
Set 4x weekly 5 hr move tasks block
|
2026-07-03 |
Complete |
Moving |
High |
|
|
Caleb |
|
Edit
Delete
|
|
pay balance with expresstoll
|
2026-07-03 |
Complete |
Personal |
Medium |
|
|
Caleb |
|
Edit
Delete
|
|
Clean or wash Tacoma
|
2026-07-05 |
Complete |
Outdoors |
Low |
|
|
Caleb |
|
Edit
Delete
|